Project Description
TEMPORARY MODULAR OFFICE COMPLEX
Sturgeon Lake CFS Temporary Modular Office Complex
Sturgeon Lake Cree Nation Child and Family Services Society

The work generally involves the construction of:
Temporary Modular Office Complex – Site Preparation
- Waste stripping to Common 775m3
- Trenching and Backfilling 36 l.m.
- Supply and install 100mm sanitary service 20 l.m.
- Supply and install 50mm water service 21 l.m.
- Supply and place water cistern complete with pump Lump Sum
- Supply and place sanitary holding tank Lump Sum
- Common excavation of embankment 3,600 m3
- Waste exaction of unsuitable material to Common 3,320 m3
- Supply and place borrow in road and parking areas 3,660 m3
- Supply and place engineered fill under building 3,010 m3
- Subgrade preparation 4,500 m2
- Supply, place, and compact gravel at 150mm depth 975 m2
- Supply, place, and compact gravel at 450mm depth 1.355 m2
- Supply, place, and compact gravel at 300mm depth 1,660 m2
- Shaping and grading of drainage ditch and swale 175 l.m.
- Place topsoil from the on-site stockpile 3,000 m2
- Broadcast seeding 4,475 m2
- Supply and install CSP 2 ea.
- Supply and install concrete parking bumper 11 ea.
- Provisional: Supply and install Geogrid 850 m2
- Provisional: 20kg cement stabilization 850 m2