MAIN ACCESS ROAD AND BRIDGE ASSET REPLACEMENT

Home  /  Projects  /  MAIN ACCESS ROAD AND BRIDGE ASSET REPLACEMENT

Date:

November 15, 2023

status:

Tender

Location:

Loon Lake, AB

what we did:

Upgrades to Main Access Road and Replacement of Bridge

Project Description

Loon River First Nation #476 Main Access Road Upgrade

  1. Excavation of Waste Material 23,600 m3
  2. Remove and Dispose Existing Culverts 20 ea.
  3. Common Excavation 27,500 m³
  4. Borrow Material from Designated Source 68,550 m³
  5. Subgrade Preparation 83,700 m²
  6. Supply and Haul crushed granular base 43,800 tonne
  7. Place 250 mm Depth Crushed Granular Base 60,550 m²
  8. 75 mm Hot-Mix Asphalt (1st Lift) 54,350 m²
  9. 40 mm Hot-Mix Asphalt (2nd Lift at FAC) 52,400 m²
  10. Supply and Painting of Thermoplastic Pavement Centerline 7,700 l.m.
  11. Supply and Painting 100mm Wide of Edge Lines 11,100 l.m.
  12. Topsoiling 9.00 Ha.
  13. Broadcast Seeding 9.00 Ha.
  14. Supply and install various diameter and length CSP Culverts 29 ea.

Bridge Works

  1. Removal and Disposal of Existing Bridge Structure Lump Sum
  2. Excavation of Bridge Construction Lump Sum
  3. Supply of piling – 310mm x 94mm H-piles (plain) 384 l.m.
  4. Supply of piling – 310mm x 94mm H-piles (Galvanized) 20 l.m.
  5. Supply of piling – 610mm x 12.50mm pipe piles (plain) 258 l.m.
  6. Supply of piling – 610mm x 12.50mm pipe piles (Galvanized) 42 l.m.
  7. Pile Rig-Set-Up 30 ea.
  8. Pile driving – 310mm H-piles 403 l.m.
  9. Pile driving – 610mm Ø pipe piles 300 l.m.
  10. Supply and place concrete – Class “Pile” 81 m³
  11. Reinforcing steel – Plain – Supply and place 14,830 kg
  12. Supply and place concrete – Class C 52.9 m³
  13. Supply of girders – 18.0m Interior SL-700 24 ea.
  14. Supply of girders – 18.0m Exterior SL-700 6 ea.
  15. Delivery of girders Lump Sum
  16. Erection of girders Lump Sum
  17. Reinforcing steel – Stainless Steel – Supply and place 616 kg
  18. Reinforcing steel – Corrosion Resistant – Supply and place 21,951 kg
  19. Supply and place concrete – Class HPC 144 m³
  20. Bridgerail Lump Sum
  21. Guardrail Lump Sum
  22. Backfill Lump Sum
  23. Heavy rock Riprap (Class 1) 315 m³
  24. Pedestrian jersey barrier – supply and install 90 l.m.
  25. Silt Fencing 200 l.m.

UNDERGROUND WORKS

  1. Removal and disposal offsite of sanitary sewer 379 l.m.
  2. Removal and disposal offsite of sanitary manhole 2 ea.
  3. Trenching and backfilling 533 l.m.
  4. Supply and install 200mm DR35 PVC sanitary sewer 123 l.m.
  5. Supply and install 250mm DR35 PVC sanitary sewer 305 l.m.
  6. Supply and install 1200mm sanitary manhole c/w F-39 frame and cover 5 ea.
  7. CCTV sewer inspection 428 l.m.
  8. Shift existing manhole frame and cover to manhole opening 3 ea.
  9. Manhole barrel and grade-ring adjustment 3 ea.
  10. Utility hydrovac 50 hr

To be added to our bidders list, please contact engineering@sedesign.ca