STURGEON LAKE CFS

TEMPORARY MODULAR OFFICE COMPLEX Sturgeon Lake CFS Temporary Modular Office ComplexSturgeon Lake Cree Nation Child and Family Services Society The work generally involves the construction of: Temporary Modular Office Complex – Site Preparation

Read More

56TH STREET AND 51ST AVENUE UNDERGROUND AND ROADWAY REHABILITATION

SE Design was tasked to design the underground system (water, storm, gravity sewer, pressure sewer including a lift station, and all water/sewer service lines), road, curb, and sidewalk on 56th Street, 51st Avenue, and 56th Street laneway to the Village of Glendon Standard. SE Design was responsible for providing preliminary engineering, topographic survey, detailed design…

Read More

16TH AVENUE UNDERGROUND INFRASTRUCTURE REPLACEMENT AND ROAD REHABILITATION

16th Ave Project Profile

SE Design was tasked to design the rehabilitation of the underground infrastructure (water, and sanitary), road, curb and sidewalk on 16th Avenue from 5th Street to 6th Street within the City Cold Lake municipality. SE Design was responsible for providing preliminary engineering, topographic survey, detailed design drawings, cost estimation and tendering. During the construction phase…

Read More